Applications in GIS
Print Version |
|
Search Results |
Displaying Results 1 - 8 out of 8 |
[New Search] | << Previous | Next >> |
Expand All |
1 | Practice: | CDOT Planning Insight Network Public Commenting Tool (PIN) |
Subject Area: | Planning | |
State: | Colorado | |
Organization: | Colorado Department of Transportation | |
Contact: | Aaron Willis | |
Email: | Aaron.Willis@dot.state.co.us | |
Phone: | 303-512-4019 | |
Description: | Planning Insight Network (PIN) is a web-based application that allows the public to access all 15 regional long range transportation plans and provide comments. Through this GIS interactive tool the p ...[click for more] | |
2 | Practice: | Colorado Corridor Streamlining Evaluation Project |
Subject Areas: | Environment Planning | |
State: | Colorado | |
Contact: | Stephanie Gibson | |
Email: | Stephanie.gibson@dot.gov | |
Phone: | 720-963-3690 | |
Description: | The Colorado Department of Transportation (CDOT) currently evaluates impacts to the human and natural environment on a project-by-project basis and at the project design level. On corridors with many successive projects, this often results in the replication of environmental impact studies. CDOT's Corridor Streamlining Evaluation Project is developing a method for evaluating potential impacts to resources from future projects at the corridor level and during project planning. By conducting evaluations at the corridor level, several projects can be evaluated, lessening the number of studies needed. As part of this pilot project, CDOT conducted a pilot study on State Highway 24 to evaluate the use of aerial imagery and remote sensing technology to accurately map environmental resources. The pilot, which builds on previous CDOT efforts to map wetlands with infrared photography, mapped plant communities, sensitive species habitats, wildlife corridors, historical and archeological resources, and hazardous waste sites. The pilot also evaluated the relative and absolute accuracy of different scales and assessed various methods of interpreting remotely-sensed imagery. Wetlands data collected and stored in CDOT's Geographic Information System (GIS) are already being used to predict impacts, select wetlands mitigation sites, and support a Section 7 consultation for a threatened species. CDOT used a refined application of this technology on the US 285 transportation corridor project to support a feasibility study. Using remotely-sensed data to identify lynx habitat and model probable lynx dispersal routes, CDOT is locating the best sites for crossing structures. Overall, CDOT's Corridor Streamlining Evaluation Project will allow it to map boundaries and objects and collect environmental data accurately while projects are still being conceptualized. The base maps developed and data collected will allow CDOT to decide on project design, develop cumulative impact assessments, and anticipate and identify mitigation needs and opportunities. | |
3 | Practice: | Data, Maps, and Statistics |
Subject Areas: | Asset Management Environment Operations | |
State: | Colorado | |
Organization: | Colorado Department of Transportation | |
Contact: | Kim Hubble | |
Email: | Kim.Hubble@dot.state.co.us | |
Phone: | 303-757-9526 | |
Description: | The Data Access application provides users with highway attribute information including geometrics, traffic counts, environmental information, and pavement information through multiple tools. Highway ...[click for more] | |
Related Documentation: | https://dtdapps.coloradodot.info/otis | |
4 | Practice: | OTIS |
Subject Area: | GDC | |
State: | Colorado | |
Organization: | Colorado Department of Transportation | |
Contact: | Gary Aucott | |
Title: | GIS Specialist | |
Email: | Gary.Aucott@state.co.us | |
Description: | CDOT's OTIS is a portal that provides access to a wide range of geospatial information for transportation planning and project development, as well as for public reference. OTIS is essentially a centr ...[click for more] | |
Related Documentation: | https://dtdapps.coloradodot.info/otis | |
5 | Practice: | Planning and Environmental Linkages Decision Tool (PEL) |
Subject Areas: | Environment Planning | |
State: | Colorado | |
Organization: | Colorado DOT | |
Contact: | Francis Oppermann | |
Title: | Environmental Planner | |
Email: | Francis.Oppermann@dot.state.co.us | |
Phone: | 303-757-9497 | |
Description: | This application provides users with a tool for determining what level of work may be necessary before a project can be constructed, and what early steps can be taken prior to project development to m ...[click for more] | |
Related Documentation: | https://www.codot.gov/programs/environmental/planning-env-link-program | |
6 | Practice: | Prioritizing Potential Crossing Areas for a Programmatic Approach to Section 7 Consultation for the Canada Lynx - Colorado DOT |
Subject Area: | Environment | |
State: | Colorado | |
Organization: | Colorado Department of Transportation | |
Contact: | Jeff Peterson | |
Title: | Threatened and Endangered Species Coordinator | |
Email: | jeff.peterson@dot.state.co.us | |
Phone: | 303-512-4959 | |
Description: | The Colorado Department of Transportation (CDOT) is developing a programmatic approach to Section 7 of the Federal Endangered Species Act for the wide-ranging Canada lynx. The Canada lynx was listed a ...[click for more] | |
7 | Practice: | Project information and Mapping |
Subject Areas: | Asset Management Environment Maintenance Operations Planning | |
State: | Colorado | |
Organization: | Colorado DOT | |
Contact: | Jamie Collins | |
Title: | Budget & Policy Analyst | |
Email: | Jamie.Collins@dot.state.co.us | |
Phone: | 303-757-9092 | |
Description: | CDOT uses SAP software for its Enterprise Resource Planning (ERP). A web mapping interface was developed to allow CDOT to enter and track locational information and other aspects of transportation con ...[click for more] | |
Related Documentation: | http://dtdapps.coloradodot.info/prolojs/ | |
8 | Practice: | Transportation Secure Data Center (TSDC) |
Subject Areas: | Environment Planning | |
State: | Colorado | |
Organization: | National Renewable Energy Laboratory Center for Transportation Technologies and Systems | |
Contact: | Jeff Gonder | |
Title: | Senior Engineer | |
Email: | Jeff.Gonder@nrel.gov | |
Description: | FHWA's Fall 2011 GIS in Transportation Newsletter describes the National Renewable Energy Laboratory Center (NREL) for Transportation Technologies and Systems' development of the Transportation Secure ...[click for more] | |
Related Documentation: | https://www.gis.fhwa.dot.gov/newsletters/Newsletter_Fall2011.aspx | |
Displaying Results 1 - 8 out of 8 | ||
<< Previous | Next >> |